Essential details
Surface Handling: Screen Printing
Industrial Use: Beverage
Base Material: Glass
Body Material: Glass
Collar Material: Glass
Sealing Type: Swing top
Use: Beer
Place of Origin: Shandong, China
Model Number: TNN001
Brand Name: TNN
Color: Amber
Usage: Beverage
Shape: Round Shape
Cap: Swing top
Capacity: 500ml
Height: 224.6mm
Diameter: 79mm
Weight: 430g
OEM/ODM: Yes
MOQ: 1000pcs
Â
Packaging Details: Pallet, Carton, Pallet+Carton
Lead time:
Quantity(pieces) |
1 - 3000 |
> 3000 |
Lead time (days) |
15 |
To be negotiated |
Â
Materials |
Lead-Free Glass+crown cap |
Color |
clear, amber, Any color is available based on demands. |
Customers' logo |
Accepted |
ODM& OEM |
Welcome |
Surface Treatment |
silkscreen; hot stamping; frosted; decal; painting; electroplating; spray; label; sticker, etc. |
Lid/Cap |
cork; rubber; aluminum screw cap; glass stopper, etc. |
MOQ |
1. For ready stock, MOQ is 3,000pcs |
Packaging |
standard carton; gift box; colorful box; white box; export pallets; special requirements on packing, etc. |
Capacity |
500ml |
Height |
224.6mm |
Diameter |
79mm |
Weight |
430g |
Color |
Amber, Flint |
Sealing type |
Swing top |
Logo |
Customer' s design |
Delivery time |
15-20 days |
FOB |
Any port |
Service |
CY to CY, CY to doo |
Â
Time flow:
1. In stock: 7-15 Days
2. Made to order: 25-35 Days
3. Made to order, requiring new molds and deep processing: 50-75 Days
Â
1) Crown cap could be offered
2) Customized mold will be welcome
3) Logo can be made on bottle body
Sealing type |
swing top |
package |
Pallet; Pallet + Cartom; color Carton |
Delivery time |
Pallet packaging 20 days; carton packaging within 30 days |
Trade terms |
FOB CIF DDP DDU |
Deep processing |
Color painting, Decoration firing, Screen printing, Electoplating, Embossing |
customer |
Accept customer customization |
Minimum order quantity |
pcs |
Pallet+Carton packaging |
pcs*cases; Total pcs |
Â
1. Raw Materials: Silica sand, Soda ash, Limestone and others
2. Batch house: Weighing and mixing of raw material, and transport to the hopper at the melting furnace
3. Melting: Melting of mixed raw materials about 1550℃ in the melting furnace
4. Feeding: Feeding of glass gob at optimum temperature suitable to bottle weight and shape is fed into a glass bottle-forming machine via the feeder.
5. Forming: Forming of bottle by the glass bottle-forming machine for designed bottle shape
6. Annealing: Annealing of bottles as they leave the glass bottle-forming machine
7. Inspection: After annealing in the lehr, a bottle is strictly checked on Automatic inspection machine and visually inspect each bottle to confirm quality by skilled technicians
8. Additional processing: Decal, Frosting, spraying
9. Packing and Shipment: Bottles are packed according to their destination, and are stored in the warehouse or shipped
Â
Q: Support OEM or ODM?
Q: What kind of bottle decoration can you offer?
Q: What is your MOQ?
Q: Can I get samples?
Q: How long is the sample lead time?
Q: How can we guarantee the quality?
Q: Why should you order from us not from others?
Â
http://www.tnnindustry.com/